Bramley.
Book a call

Looking for one consultancy to build this.

in design

Environmental Filing Agent is being built to assemble site-condition and excess-soil filings and check them against the regulation, so the file reaches your QP already checked.

Book a call
Aerial view of worked land

Your QP's signature is scarce.

That signature is statutory and non-delegable. It makes the review cycle the most expensive part of the job, because every iteration spends the same hours twice.

Checked against the regulation first.

Each figure is traced to its source and each requirement is checked against O. Reg. 153/04 and O. Reg. 406/19.

The QP's own work stays the QP's. We assemble and check around the APEC table, the past-uses table and the conceptual site model. We never generate them.
Requirement checkRSC-2026-0142
O. Reg. 153/04 — requirementsChecked
O. Reg. 406/19 — requirementsChecked
Every figure traced to its sourceChecked
APEC tableYour team
Past-uses tableYour team
Conceptual site modelYour team
Sign-off Qualified Person
Sample result — illustrative

One firm shapes it.

This one is still in design. We want a QP-holding consultancy to build it against real filings, with the discovery credited in full and their method driving the early roadmap.

Recurring operator filings such as NPRI and GHGRP are the planned next lane.

A filing your QP has signed.

Book a call