Energy Audit Agent is being built to assemble the audit and M&V report to method, so those hours stop coming out of the fee the audit was priced to win.
Principals at energy audit and M&V firms, where the number of projects the firm runs in a year is set by how many reports a P.Eng. can get through.
Bramley computes the measures table and the baseline from your site data, holding every figure to the record behind it, before your engineer reviews, adjusts and signs.
| Lighting retrofit — measure | Recomputed |
| Building envelope — measure | Recomputed |
| HVAC scheduling — measure | Recomputed |
| Baseline against the IPMVP option | Checked |
| Every figure traced to its source | Checked |
| Engineer review | In progress |
Report assembly is in development. The incentive-filing drafting that attaches to it — IESO measures and TRMs — is already a working prototype today.