Products

The technical report, checked before the QP signs

The NI 43-101 Mining Agent checks technical disclosure against Form 43-101F1: every required item present, every figure consistent, every source traced, before the Qualified Person puts their name on it.

Book a call
Built · demo-ready
Form 43-101F1 · item check Sample result: illustrative
CheckResult
Item 14 · Mineral Resource EstimatePresent
Resource table vs supporting studiesConsistent
Qualified Person consentOn file
Effective date vs signature dateInconsistent: flagged
Sign-offQualified Person

What it does

01

Reads the drill data, the resource estimate and the supporting studies.

02

Maps the disclosure to the form's own item list. It never drafts what the QP's certificate covers.

03

Flags what is missing or inconsistent while there is still time to fix it, not after the regulator does.

Why now

Critical-minerals disclosure is under more scrutiny than it has ever been, and the checking is still done by hand at the most expensive hour rate in the building.

Quarry site from above

The NI 43-101 Mining Agent is built and demo-ready. We're reaching out to mining consultancies with the onboarding backtest: send us a technical report, filed or in draft under NDA, and we show you what the checks catch.

Book a call